default_mobilelogo

PROKON Wind Energy Finland Oy

11.05.2017

Building permits for all 76 Wind turbines in Mutkalampi

Building permits for all 76 wind turbines in Mutkalampi wind farm are in force after the 31 building permits in Mökkiperä-Pahkamaa area in Kalajoki gained legal force 14.4.2017. The building permits in Mökkiperä-Pahkamaa are restricted till the land use plan gain legal force.